Posts

Showing posts with the label Method Statement

Method Statement for Application of Waterproofing Membrane

  Method Statement for Application of Waterproofing Membrane The purpose of the method statement for application of waterproofing is to prevent the water to percolate or penetrate into any underground concrete members. When the water penetrates into the sub-grade concrete-like foundation such as mat foundation, footing, tie beam, etc. the steel reinforcement that embedded in the concrete would corrode due to a chemical reaction caused by water and the structure would eventually fail. Application of  waterproofing  especially for large structures would have to be strictly supervised by a quality engineer in order to prevent failure of application or nonconformity to the quality procedure. In this method statement for application of waterproofing membrane, we’ll be going to use the membrane type waterproofing, this type of  waterproofing  is advisable for structures like high-rise buildings which has a deeper foundation where water pressure is extremely high...

Method Statement for Temporary Ladder Access Scaffolding and Walkway for Hanging Platform

  Method Statement for Temporary Ladder Access Scaffolding and Walkway for Hanging Platform Do you know that a temporary ladder access  scaffolding  is the equipment or tools we used to access the hanging platform on the ceiling area of the hangar? The purpose of installing temporary ladders access scaffolding and walkway is to use by workers to access the hangar roof ceiling level so that the MEP trades can be installed. In this method statement, I will show you how to properly install the temporary ladder access scaffolding and walkway. 1. Title Method Statement for Temporary Ladder Access  Scaffolding  and Walkway for Hanging Platform 2. Purpose The purpose of this method statement is to describe the measures and system, a procedure that will be adopted for installation of temporary ladder access scaffolding tower and walkway on the Steel frame for hanging platform installation at hanger, on the ceiling area of the hangar. This method statement has been prepa...

Method Statement for Installation of Anchor Bolts

Method Statement for Installation of Anchor Bolts Construction of a pre-engineered structure such as steel structure is a challenging work. It requires the full attention of qualified staff.  It also needs a qualified  QAQC Engineer  to inspect the work of a construction team to ensure that the completed work is fully compliant with the project requirement. One of the most challenging jobs in the construction of steel structure is the installation of anchor bolts where it is considered to be an ankle joint of a steel column. A method statement of the installation of anchor bolt should be developed to make sure that the process is true against the approved drawing and the most important, it should be within the safe working condition. Here is the method statement for installation of anchor bolts. 1. Title Method Statement for Installation of Anchor Bolts 2. Purpose This method statement shows and explains the procedure must be followed to i...

Method Statement for Installation of Kerbstone and Interlock Tiles Inside The Building

Method Statement for Installation of Kerbstone and Interlock Tiles Inside The Building In the construction of a high-rise building, there would be basements, perhaps 2 or 3 or more depending on the design plus a ground floor. In these levels, there is car parking for the tenant cars if it is residential and apartment buildings or if that is a shopping mall there will be also parking for shoppers. Along these car parkings, we need to install kerbstone and lay interlock tiles for the walkways and sidewalk. These two materials are always together in these type of works. So if you are a quality engineer, you have to make sure that the method statement for kerbstone and interlock tiles is submitted to the engineer for approval before you can start the activity on the site. By the way, this method statement is different from the  method statement for interlock works , this methodology is for outside the building. Now, below is the  method statement for kerbstone ...